Fugro starts site investigations at two UK offshore wind farms

Fugro starts site investigations at two UK offshore wind farms

Fugro has begun a four-month marine site characterisation campaign for Swedish energy group Vattenfall at two major offshore wind development sites located over 40 km off the coast of Norfolk, UK.


The resulting Geo-data from Fugro’s geotechnical investigations will feed into the ground model for the Norfolk Vanguard and Norfolk Boreas wind farms, which will have a total installed capacity of 3.6 GW, enough to power more than 3.9 million homes.

Fugro Scout DP2 geotechnical drill ship
Fugro’s DP2 geotechnical drill ship

Working from its dynamically positioned (DP2) geotechnical drill ship Fugro Scout, Fugro is performing surveys and sampling using its proprietary SEACALF® Mk V DeepDrive cone penetration testing system at both sites, and will carry out testing both in situ and at the company’s world-class soils laboratories in Wallingford, UK, and Nootdorp in the Netherlands.


The site characterisation work is split across two projects: the first will help Vattenfall optimise the wind turbine foundation engineering design; the second will assist Vattenfall in selecting the most efficient cable route from the onshore substation to the turbines.


Source / More information : Fugro


Report by: OGP/Segun Cole , Please email us your industry related news for publication info@OilAndGasPress.com
Follow us: @OilAndGasPress on Twitter | OilAndGasPress on Facebook

Oil and Gas News Straight from the Source


Disclaimer
Most News articles reported on OilAndGasPress are a reflection of what is published in the media. OilAndGasPress is not in a position to verify the accuracy of daily news articles. The materials provided are for informational and educational purposes only and are not intended to provide tax, legal, or investment advice. OilAndGasPress welcomes all viewpoints. Should you wish to provide a different perspective on the above article, please email us info@OilAndGasPress.com

Information posted is accurate at the time of posting, but may be superseded by subsequent press releases

#FOLLOW US ON INSTAGRAM