Paradigm announce release of Sysdrill 10

Paradigm announce release of Sysdrill 10

Paradigm announced the release of Paradigm® Sysdrill® 10, the latest version of our integrated suite of well planning and drilling engineering applications. Sysdrill 10 is integrated with Peloton’s WellView®/Masterview® corporate database for drilling and well operations, and includes a new jar placement module based on technology acquired from Cougar Drilling Solutions.
The jar placement module allows the calculation of optimal jar locations based upon jar operating parameters, drilling parameters, and the well trajectory.
The integration with Peloton offers a complete solution for well planning, drilling engineering, daily reporting and data management throughout the well life cycle. Drilling engineers can send a fully engineered Sysdrill well design to WellView, and during drilling operations, data captured in MasterView can be used in Sysdrill to perform engineering analysis to monitor drilling and prevent NPT events.
Sysdrill 10 also offers significant engineering enhancements to the product’s existing well planning, torque & drag, hydraulics, casing design, cementing and well control modules.
Paradigm invites you to visit Paradigm booth #3028 at the SPE Annual Technical Conference and Exhibition (ATCE) in Amsterdam, October 27-29, where they will be happy to show you the Sysdrill 10 application suite and answer any questions you might have.
Source:
Untitled
Oil and Gas Press

#FOLLOW US ON INSTAGRAM