Gridserve gets green light for second Electric Forecourt in Essex

Basildon Borough Council has approved GRIDSERVE Electric Forecourt® in Nevendon.

The Nevendon Electric Forecourt® is to be located off the A132 (Nevendon Road), north of the A127 Nevendon Flyover and within close proximity to the centre of Basildon, made famous by musical alumni that includes Alison Moyet and Depeche Mode.

The approved design will sit on approximately 3.34 acres (1.35ha) of greenfield land, which allows scope for the installation of 31 industry leading EV chargers to support electric cars, motorcycles, vans, buses, trucks and other modes of zero emissions transport.

As is the GRIDSERVE way, all chargers will be membership free, accept contactless payment and be powered by net zero carbon energy, while on-site battery storage will help to reduce grid dependency.


Information Source: Read More

Energy Monitors , Electric Power , Natural Gas , Oil , Climate , Renewable , Wind , Transition , LPG , Solar , Electric , Biomass , Sustainability , Oil Price , Electric Vehicles,Commodities , Shipping,

#FOLLOW US ON INSTAGRAM