22 Dec Baker Hughes wins equipment supply contract for Commonwealth LNG Export Project
(Oilandgaspress) Baker Hughes received a Full Notice To Proceed from Technip Energies on behalf of Commonwealth LNG to supply primary liquefaction equipment for Commonwealth LNG’s 9.5 million tonnes per annum (MTPA) export facility currently under development in Cameron, Louisiana.

The award, which includes six refrigerant turbo compressors comprising LM9000 aeroderivative gas turbines paired with centrifugal compressors, leverages Baker Hughes’ proven, best-in-class LNG technologies to support Technip Energies and Commonwealth LNG. Baker Hughes’ established collaboration with both companies will help ensure the efficient delivery of Commonwealth LNG’s state-of-the-art export facility, designed to meet the growing global demand for reliable, lower-carbon LNG.
The LM9000 is the most efficient gas turbine in its power class (70+ MW range) with more than 44% efficiency in ISO conditions. Its mean time between maintenance (MTBM) and a compact package design enable simplified maintenance, extended service intervals, high availability, and fast installation and commissioning. The scope also includes commissioning services, capital spares, extended warranty, and a full string test.
Information Source: Read More
Oilandgaspress ,Oil and Gas , Energy , Climate, Gas,Renewable, Sustainability, Oil Price, LPG, Solar, Marine, Aviation, Fuel, Hydrogen, Electric ,EV, Gas, Automobile, cars,
Sorry, the comment form is closed at this time.