Centrica re-opens Rough storage facility

Centrica has announced the reopening of the Rough gas storage facility, having completed significant engineering upgrades over the summer and commissioning over early autumn. The initial investment programme means the company has made its first injection of gas into the site in over 5 years and is in a position to store up to 30 billion cubic feet (bcf) of gas for UK homes and businesses over winter 2022/23, boosting the UK’s energy resilience.

The work done so far means that Rough is operating at around 20% of its previous capacity this winter, immediately making it the UK’s largest gas storage site once again and adding 50% to the UK’s gas storage volume. Rough will help to balance the UK’s gas market, injecting gas into the facility when prices are low and putting that gas back into the UK’s gas network when demand is higher. Centrica’s long-term aim is to turn the Rough gas field into the largest long duration energy storage facility in Europe, capable of storing both natural gas and hydrogen.


Information Source: Read More

Energy Monitors | Electric Power | Natural Gas | Oil | Climate | Renewable | Wind | Transition | LPG | Solar | Electric | Biomass | Sustainability | Oil Price |

#FOLLOW US ON INSTAGRAM