Equinor restarts Peregrino field production

Production in the Peregrino field in Brazil resumed on 16 July, aiming to ramp up production and reduce emissions intensity.

Peregrino production was suspended in April 2020. Since then, Equinor has executed a major programme of maintenance, upgrades and repairs on the Floating Production Storage and Offloading (FPSO) vessel and has installed a new platform, Peregrino C.
Together, these investments have allowed production to safely restart, to increase the overall capacity of the field and to improve the carbon emissions intensity.

“Our top priority is the safety of our people and our operations. The investments in technology, new equipment and maintenance have allowed us to safely resume production at Peregrino and to prepare for the start-up of the new Peregrino Phase 2 project,” says Veronica Coelho, Equinor’s country manager in Brazil.


Information Source: Read More

ENERGY | ELECTRIC POWER | NATURAL GAS | AUTOMOTIVE | CLIMATE | RENEWABLE | WIND | TRANSITION | LPG | OIL & GAS | SOLAR | ELECTRIC VEHICLES| BIOMASS | SUSTAINABILITY | OIL PRICE |COMMODITIES | ELECTRIC POWER | NUCLEAR | LNG | REFINED PRODUCTS | SHIPPING|

#FOLLOW US ON INSTAGRAM