First power from Hywind Tampen

Power production from the first turbine in the floating wind farm Hywind Tampen in the North Sea started at 12:55 CET on 13 November. The power was delivered to the Gullfaks A platform in the North Sea.

“I am proud that we have now started production at Hywind Tampen, Norway’s first and the world’s largest floating wind farm. This is a unique project, the first wind farm in the world powering producing oil and gas installations,” says Geir Tungesvik, Equinor’s executive vice president for Projects, Drilling and Procurement.

Owned by the Gullfaks and Snorre partners, the Hywind Tampen wind farm is expected to meet about 35 percent of the electricity demand of the two fields. This will cut CO2 emissions from the fields by about 200,000 tonnes per year.


Information Source: Read More

Energy Monitors | Electric Power | Natural Gas | Oil | Climate | Renewable | Wind | Transition | LPG | Solar | Electric | Biomass | Sustainability | Oil Price |

#FOLLOW US ON INSTAGRAM