Keppel O&M wins newbuild FPSO P-80 contract from Petrobras

New generation FPSO to minimise emissions with carbon capture and reinjection as well as energy recovery capabilities

Keppel Offshore & Marine (Keppel O&M)’s wholly owned subsidiary, Keppel Shipyard, has won an international tender from Brazil’s National Oil Company, Petroleo Brasileiro S.A (Petrobras), for the engineering, procurement and construction (EPC) of P-80, a Floating Production, Storage and Offloading vessel (FPSO) for about US$2.9b.

Scheduled for completion in 1H 2026, the P-80 is the second FPSO that Keppel O&M will be building for Petrobras for the Buzios field in Brazil. The first FPSO, P-78, is currently under construction by Keppel Shipyard. The P-80 is structured on progressive milestone payments and will be cash-flow neutral during its execution lifecycle. It would add over S$4bn to Keppel O&M’s orderbook.

The P-80 will be one of the largest floating production units in the world with a production capacity of 225,000 barrels of oil per day (bopd), water injection capacity of 250,000 bpd, 12 million cubic metres of (Sm3/d) of gas processing per day and a storage capacity of two million barrels of oil. When completed, the P-80 will be on par with the largest oil producing platforms in Brazil.


Information Source: Read More–>

ENERGY | ELECTRIC POWER | NATURAL GAS | OIL | CLIMATE | RENEWABLE | WIND | TRANSITION | LPG | OIL & GAS | SOLAR | ELECTRIC | BIOMASS | SUSTAINABILITY | OIL PRICE |

#FOLLOW US ON INSTAGRAM
Energy, Automobile, EV, Renewable News
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.