McDermott Wins Scarborough EPCIC Contract
McDermott International has been awarded a contract by Woodside, as Operator for and on behalf of the Scarborough Joint Venture, for the engineering, procurement, construction, installation and commissioning (EPCIC) services for its Floating Production Unit (FPU) offshore Western Australia. The integrated scope also includes the design, fabrication, integration, transportation and installation of the hull and topsides.
“McDermott brings the engineering and execution expertise to deliver integrated deepwater subsea projects and offshore FPUs to the highest standards,” said Samik Mukherjee, Executive Vice President and Chief Operating Officer. “After a long engagement on the project, the collaborative execution model with Woodside—from pre-FEED through to EPCIC—de-risks execution. Further, the facilities incorporate energy efficiency in design to reduce Scarborough’s offshore emissions.”
The topside, which will be approximately 30,000 tons, will be fabricated by McDermott’s joint venture fabrication yard, Qingdao McDermott Wuchuan, in China. The project scope includes a battery energy storage system to reduce emissions on the topsides and support Woodside’s net emissions reduction targets.
Information Source: Read More
Oil and gas, press , | Energy, Climate, Renewable, Wind, Biomass, Sustainability, Oil Price, LPG, Solar, Electric,