Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

NGL Energy Partners LP Announces LEX II Large Diameter Pipeline Supported by New MVC and Extension of Acreage Dedication

TULSA, Okla.–(BUSINESS WIRE)–NGL Energy Partners LP (NYSE:NGL) (“NGL,” or the “Partnership”) announced today that NGL Water Solutions is commencing expansion of its Lea County Express Pipeline System from a capacity of 140,000 barrels of water per day to 340,000 barrels per day in 2024 (LEX II Expansion). The addition of a second large-diameter pipeline, disposal wells, and facilities will greatly expand the capabilities of NGL’s existing produced water super-system and create a significantly larger outlet for produced water disposal within the Delaware Basin. The construction of the 27-mile, 30-inch produced water pipeline will transport water to areas outside the core of the basin thereby further diversifying NGL’s geographic location of its disposal operations. The LEX II Expansion is fully underwritten by a recently executed minimum volume commitment contract that includes an acreage dedication extension with an investment grade oil and gas producer.


LEX II Expansion Highlights:

  • 27-mile 30-inch diameter produced water pipeline
  • Initial capacity 200,000 barrels per day
  • Incremental increase in committed acreage and volumes under dedication from the producer
  • Lea County Express Pipeline System expandable to 500,000 barrels per day

“NGL remains focused on our commitment to deliver reliable produced water management for our customers while remaining focused on the environment and the sustainability of our operations,” commented Doug White, EVP of NGL Water Solutions. “Today’s announcement highlights our investment in the long-term future growth and reliability of our infrastructure which provides our customers with confidence to plan their long-term developments in the Delaware Basin. This large minimum volume commitment provides additional cash flow certainty to the Partnership as NGL continues to improve its balance sheet.”

NGL owns and operates the largest integrated network of large diameter wastewater pipelines, disposal wells and produced water handling systems in the Delaware Basin. NGL’s Water Solutions segment operates in several of the most prolific crude oil and natural gas producing basins, including the Delaware, Eagle Ford and DJ Basins.

Forward-Looking Statements

Certain matters contained in this press release include “forward-looking statements.” All statements, other than statements of historical fact, included in this press release may constitute forwarding-looking statements. Although we believe that the expectations reflected in these forward-looking statements are reasonable, we cannot assure you that these expectations will prove correct. These forward-looking statements are subject to certain known and unknown risks and uncertainties, as well as assumptions that could cause actual results to differ materially from those reflected in these forward-looking statements. Factors that might cause actual results to differ include, but are not limited to, the risk factors discussed from time to time in each of our documents and reports filed with the SEC.

Readers are cautioned not to place undue reliance on any forward-looking statements contained in this press release, which reflect management’s opinions only as of the date hereof. Except as required by law, we undertake no obligation to revise or publicly release the results of any revision to any forward-looking statements.

About NGL Energy Partners LP

NGL Energy Partners LP, a Delaware limited partnership, is a diversified midstream energy company that transports, stores, markets and provides other logistics services for crude oil, natural gas liquids and other products and transports, treats and disposes of produced water generated as part of the oil and natural gas production process.

For further information, visit the Partnership’s website at www.nglenergypartners.com.

Contacts

Contact for Expansion Opportunities
NGL Water Solutions

Christian Holcomb, 303-815-1010

Senior Vice President & Chief Operating Officer – NGL Water Solutions

Christian.Holcomb@nglep.com

Investor Contact:
NGL Energy Partners LP

David Sullivan, 918-495-4631

Vice President – Finance

David.Sullivan@nglep.com

#FOLLOW US ON INSTAGRAM