11 Dec Drax to turn coal-era infrastructure into data centres by 2027
London, December 11, 2025, (Oilandgaspress) ––The Drax Power Station site comprises over 1,000 acres and 4GW of capacity and grid access, with 2.6GW of active dispatchable generation, cooling systems, and proximity to the UK fibre network. The Group is focused on options to maximise value from...